 |


|
 |
PCP
Impacted Groundwater Confidential
Client
Northwest USA
AQUAMEND™ was selected for pilot-scale
demonstration on pentachlorophenol (PCP) impacted
groundwater at a facility in Northwest USA.
A 500 gallon pilot-scale bioreactor system was
operated by the on-site personnel with remote
technical support from Adventus. AQUAMEND™
treatment systems are designed to be dependable
and simple to operate. The site groundwater
contained PCP at an initial concentration of
approximately 1,300 mg/L.
Using a hydraulic retention time (empty bed
contact time) of 2 hours, AQUAMEND™
treatment consistently supported reductions in
PCP concentration to < 2.1 mg/L. Using a
hydraulic retention time of 3 hrs resulted in
reductions in PCP concentrations to below
detection limits. |
 |