Find Us On:    LinkedIn | Twitter | Facebook | RSS Feeds  
» Projects : EHC-M® Project Summaries

Representative EHC-M® Project Summaries

Heavy Metals

View Projects View Projects

Client Testimonial: Washington Superfund Site

“Due to a combination of subsurface conditions and the limitations of pump and treat technology, our Washington Superfund client needed an in situ remedy to address recalcitrant Cr(VI) and TCE contamination in groundwater. Concentrations of Cr(VI) and TCE in the hot spot area were approximately 200 ppb and 8 ppb respectively. EA evaluated a number of products capable of addressing these commingled contaminants, and chose Adventus Group’s EHC-M because it supports both chemical and biological reduction processes, resulting in greater longevity over other products due to the ZVI component. EHC-M was applied using direct push injection at depths of 80 to 90 feet below the surface and, within 3 months of the application, Cr(VI) and TCE concentrations were below detection limits.”

—Eric Marhofer, Project Manager, EA Engineering, Science, and Technology, Inc.

   Share |